I also worked on the fuel cell and am extremely stoked on how it came out. Drew it all in 2d cad and cut it all correctly the first time and with no screw ups from the cnc. Never would have thought I would be able to make something like this.
Screwed with the front suspension some. I rebent the panhard with a single bend and moved the frame side mount back some. And added a small bend to the draglink to clear the ram.
Engine skid plate. I ended up taking the sub frame apart and sleeved all the main tubes with some 1.75. Engine skid plate was out of 1.75 so sleeved with 1.5.
And finally finished the subframe to frame tubes. Tube work is getting easier. When I started this the two end tubes took me all day to make. I made the 5 tubes between the original two on both driver and passenger in just a few hours today. Feel like there’s good clearance.
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.