Update on the build:
-Top of cage and rockers tube are full welded and pillars are ready to be tacked.
-Stepped up to monster 40” nittos so some more trimming will need to be done
- Rear pivots are all welded and body will go back on for last time.
- rear aluminum links are cut and ready to install
-Rear axle brackets are located and ready to be fully welded.
-Upright is going to send cut send, then I can build the upper J-arm, make the CO and bypass mount. Plan to build the mounts into the engine cage vs welding it on the frame.
After that she will be a roller, which I can’t wait to see. She is sitting roughly at ride height right now. With 40s the rear has 13” of up-travel.