02xltranger re re rebuild

Its been slow going. I did get the floor in the cab sprayed with sound deadening and painted the bottom half of the cab cage. Also the engine is ready to go in and be finalized. im now waiting on getting the trans finished because im upgrading to a extreme automatics reverse manual valve body with engine braking. so once I get that back the engine and trans will go in and I can start finishing everything. Also got the skid plate mock-up done so now its time for the aluminum one.
 

Attachments

  • 20260412_201516.webp
    20260412_201516.webp
    937.8 KB · Views: 10
  • 20260416_190920.webp
    20260416_190920.webp
    1 MB · Views: 9
  • 20260412_201015.webp
    20260412_201015.webp
    1.2 MB · Views: 10
  • 20260419_153540.webp
    20260419_153540.webp
    688.8 KB · Views: 10
  • 20260502_140028.webp
    20260502_140028.webp
    962.1 KB · Views: 10
  • 20260329_135555.webp
    20260329_135555.webp
    1.2 MB · Views: 10
Back
Top