Started working on more cooling. Moved the oil and trans coolers to the rear via some brackets from ICT billet. Upgraded the oil cooler to a 3 row much larger surface area. No fans as of yet bc we haven't hit high enough temps for me to think it's needed.
Hooked up those big -20 coolant lines. Got my (yet to be installed ) dry breaks for brake lines.














Hooked up those big -20 coolant lines. Got my (yet to be installed ) dry breaks for brake lines.













